Decorative Crosswalks at Square to be Replaced

The installation of decorative crosswalks at the square will begin on Monday, July 27. Work is planned from 7:00 PM until 5:00 AM to minimize the disruption of traffic. The contractor will have traffic control measures in place, including flaggers, to direct traffic around the area. The contractor will also be closing one lane at a time during the work. Weather permitting, the project should wrap up on Thursday, July 30.

Highly visible crosswalks are an essential tool for helping pedestrians move safely, conveniently, and predictably across roadways. Marked crosswalks also alert drivers to expect crossing pedestrians. The Borough installed the existing decorative crosswalks at High and Hanover in 2011 as part of the Road Diet project. These markings have deteriorated to the point where most are not visible. Borough staff selected a through-color, polymer-modified resin system for increased longevity. 

Visit the Road Work section of our website for more information about projects in the Borough.
Carlisle Borough Committed to Excellence in Community Service
Carlisle Borough 53 West South Street + 717 249 4422 Mon-Fri: 7:30am - 4:30pm